Copyright © Inderes 2011 - present. All rights reserved.
  • Uusimmat
  • Pörssi
    • Aamukatsaus
    • Osakevertailu
    • Pörssikalenteri
    • Osinkokalenteri
    • Analyysi
    • Artikkelit
    • Sisäpiirin kaupat
    • Transkriptit
    • Yhtiökokouskutsut
  • inderesTV
  • Mallisalkku
  • Foorumi
  • Premium
  • Femme
  • Nora AI
  • Opi
    • Sijoituskoulu
    • Q&A
    • Analyysikoulu
  • Meistä
    • Seurantayhtiöt
    • Tiimi

Vaikutat käyttävän laajaa näyttöä, haluatko laajentaa myös videosoittimen näkymän?

MPC Energy Solutions – Presentation of Q4 2025 results

– HC Andersen Capital
MPC Energy Solutions

You can already now sign up for the event and send in your questions. You don’t have to participate live to submit questions for the event.

MPC Energy Solutions expects to release its Q4 2025 results on 27 February 2026. Later the same day at 10:00 AM, the company’s CFO, Stefan Meichsner, will present the fourth-quarter and full-year 2025 results, provide an update on developments following the Q3 2025 report, and answer questions from the audience in a live online event.

Operationally, the company closed 2025 with solid momentum. In December, MPC Energy Solutions’ operating assets in Colombia, Mexico, and El Salvador generated 6.8 GWh of clean energy, in line with December 2024 on a like-for-like basis. For the full year 2025, total energy production reached 113 GWh, reflecting stable operations and the reliability of the asset base across the portfolio.

Following the Q3 2025 report, MPC Energy Solutions announced the divestment of the Santa Rosa & Villa Sol project in El Salvador and the San Patricio project in Guatemala. The transaction, which has been approved by shareholders at an Extraordinary General Meeting, is expected to generate equity proceeds of approximately USD 27 million, with closing expected in the second quarter of 2026. In connection with the announcement, the company outlined that a substantial portion of both the sales proceeds and existing free cash reserves is intended to be distributed to shareholders following completion of the transaction,

Beyond the Q4 and FY 2025 results, focus will therefore be on any changes to the timing and structure of the announced cash distributions, the development of the free cash position post-closing, and the outlook for the remaining asset base. This includes the operating projects Los Girasoles in Colombia and Los Santos in Mexico, as well as the La Perla development project in El Salvador.

MPC Energy Solutions develops, builds, owns, and operates renewable energy projects, primarily within utility-scale solar power. The company’s projects are mainly located across Latin America and the Caribbean region.

Disclaimer: HC Andersen Capital receives payment from MPC Energy Solutions for a Corporate Visibility/Digital IR subscription agreement. Michael Friis, 11.48, 16/01-2026.

Viimeisimmät videot

Exel Composites: Kysyntää monelta suunnalta
13.03.2026 klo 15.38 Exel Composites
Rapala H2'25: Pohjois-Amerikan myynti loppuvuoden valopilkku (eng.)
12.03.2026 klo 17.25 Rapala VMC
Wetteri Q4'25: Meluisa neljännes
12.03.2026 klo 15.30 Wetteri
Columbus – Presentation of Annual Report 2025
12.03.2026 klo 14.00 Columbus
Multitude Q4'25: Ansaintaprofiili muotoutumassa uusiksi
12.03.2026 klo 13.21 Multitude
Näytä kaikki videot
Sosiaalinen media
  • Inderes Foorumi
  • Youtube
  • Facebook
  • Instagram
  • X (Twitter)
  • Tiktok
  • Linkedin
Yhteystiedot
  • info@inderes.fi
  • +358 10 219 4690
  • Porkkalankatu 5
    00180 Helsinki
Inderes
  • Meistä
  • Tiimi
  • Avoimet työpaikat
  • Inderes sijoituskohteena
  • Palvelut pörssiyhtiöille
Sivusto
  • UKK
  • Käyttöehdot
  • Tietosuojaseloste
  • Vastuuvapauslauseke
Inderesin vastuuvapauslauseke löytyy täältä. Kunkin Inderesin aktiivisessa seurannassa olevan osakkeen tarkemmat tiedot löytyvät kunkin osakkeen omilta yhtiösivuilta Inderes-sivustolla. © Inderes Oyj. Kaikki oikeudet pidätetään.